Detention Basin Overflow Causes Flooding on 12/18/2005
Sunday Dec 18, 2005
This morning the detention basin in the Leona Quarry Development had completely filled up after one rain storm submerging the concrete outfall structure. (I assume that they did this to stop the water from overtopping the pond completely) This was done without the permission of the City according to city inspector. This resulted in a massive flash flood in our neighborhood of extremely silty water. This water flooded two homes, several yards and carried away at least two small bridges....
City Response to Flooding
back to top